Fire near Tocantins (BR)
12.66°S, 47.28°W · first detected on 25 September at 18:26
What the satellites measured
This fire was tracked from 25 September at 18:26 to 11 October at 19:22, that is 16 days, through 1,394 satellite detections. The detected extent reaches 20,917 ha.
- Detected extent
- 20,917 ha
- Cumulative power
- 22,397 MW
- Peak power, one pixel
- 227 MW
- VIIRS and MODIS detections
- 1,394
These four figures cover the polar orbits alone, the ones that measure an area. The pass table below also counts geostationary detections, more frequent but too coarse for geometry, and its power column sums a whole pass where the peak above is that of a single pixel.
“Detected extent” is not “burned area”: it is the union of the ground footprints of the satellite pixels, and a pixel counts in full (375 m for VIIRS, 1 km for MODIS) even when only a forest edge is burning. Compared with press figures it is in practice one and a half to three times the area reported. Detections taken at the edge of the scan swath, too coarse to measure anything at all, are excluded. These figures come from thermal detection and are not an official assessment: only the emergency services and the competent authorities are authoritative.
Replay how the fire spread
The map is framed on this fire's footprint and loads only its detections. The timeline below covers the period in which satellites saw it, from the first to the last detection, with twelve hours before and twenty-four after; the ticks on the bar mark the emergency services' announcements that fall within it. The cursor opens on the most powerful pass, and playback replays the whole fire in about thirty seconds. “1 h” shows what is burning within an hour of the chosen moment : the map then follows the power curve below and empties when it falls. “24 h” stacks twenty-four hours : a fire stays visible between two satellite passes, which come two to four times a day. Both are true, but they say different things.
How the radiative power evolved
One point per satellite pass: the sum of the fire radiative power measured over the fire. This is the curve that says whether the fire eased off or picked up again, which no cumulative figure shows. The window covers 19 days; beyond that, clustering would merge two successive fires in the same place.
Fire dynamics
Loading history…
Satellite passes in detail
| Pass | Power summed over the pass | Detections | Sensor |
|---|---|---|---|
| 11 October at 19:22 | 14 MW | 2 | N20 |
| 11 October at 19:02 | 12 MW | 1 | N |
| 11 October at 18:26 | 63 MW | 2 | N21 |
| 11 October at 06:49 | 5 MW | 3 | N20 |
| 11 October at 06:27 | 2 MW | 1 | N |
| 10 October at 19:41 | 592 MW | 20 | N20 |
| 10 October at 19:20 | 1,664 MW | 40 | N |
| 10 October at 18:43 | 962 MW | 37 | N21 |
| 10 October at 18:01 | 628 MW | 17 | N20 |
| 10 October at 06:10 | 2 MW | 1 | N21 |
| 9 October at 19:39 | 7 MW | 2 | N |
| 8 October at 19:22 | 8 MW | 1 | N21 |
| 7 October at 18:56 | 18 MW | 2 | N20 |
| 7 October at 18:01 | 6 MW | 1 | N21 |
| 5 October at 19:13 | 35 MW | 3 | N |
| 5 October at 18:37 | 4 MW | 1 | N21 |
| 3 October at 20:38 | 28 MW | 2 | Aqua |
| 3 October at 19:15 | 17 MW | 2 | N21 |
| 2 October at 06:17 | 3 MW | 1 | N20 |
| 2 October at 05:55 | 3 MW | 1 | N |
| 1 October at 19:07 | 303 MW | 23 | N20 |
| 1 October at 18:50 | 407 MW | 31 | N |
| 1 October at 18:11 | 562 MW | 23 | N21 |
| 1 October at 06:34 | 10 MW | 8 | N20 |
| 1 October at 06:17 | 15 MW | 7 | N |
| 30 September at 20:24 | 129 MW | 1 | Aqua |
| 30 September at 19:28 | 263 MW | 36 | N20 |
| 30 September at 19:07 | 222 MW | 20 | N |
| 30 September at 18:33 | 214 MW | 11 | N21 |
| 30 September at 14:04 | 134 MW | 5 | Terra |
| 30 September at 06:55 | 21 MW | 7 | N20 |
| 30 September at 06:34 | 14 MW | 7 | N |
| 30 September at 05:57 | 16 MW | 3 | N21 |
| 30 September at 01:37 | 78 MW | 5 | Terra |
| 29 September at 21:23 | 22 MW | 1 | Aqua |
| 29 September at 19:26 | 285 MW | 22 | N |
| 29 September at 18:50 | 532 MW | 34 | N21 |
| 29 September at 18:07 | 373 MW | 37 | N20 |
| 29 September at 13:25 | 628 MW | 14 | Terra |
| 29 September at 09:12 | 584 MW | 7 | Aqua |
| 29 September at 07:12 | 157 MW | 50 | N20 |
| 29 September at 06:51 | 235 MW | 49 | N |
| 29 September at 06:17 | 299 MW | 58 | N21 |
| 29 September at 02:37 | 57 MW | 1 | Terra |
| 28 September at 20:47 | 799 MW | 20 | Aqua |
| 28 September at 19:45 | 916 MW | 64 | N |
| 28 September at 19:07 | 1,236 MW | 62 | N21 |
| 28 September at 18:24 | 1,553 MW | 87 | N20 |
| 28 September at 18:03 | 1,264 MW | 80 | N |
| 28 September at 08:33 | 375 MW | 12 | Aqua |
| 28 September at 07:12 | 542 MW | 36 | N |
| 28 September at 06:34 | 176 MW | 49 | N21 |
| 28 September at 05:49 | 132 MW | 34 | N20 |
| 28 September at 01:56 | 186 MW | 13 | Terra |
| 27 September at 19:28 | 2,208 MW | 69 | N21 |
| 27 September at 18:43 | 980 MW | 30 | N20 |
| 27 September at 18:24 | 665 MW | 24 | N |
| 27 September at 17:47 | 419 MW | 21 | N21 |
| 27 September at 07:29 | 51 MW | 16 | N |
| 27 September at 06:53 | 113 MW | 26 | N21 |
| 27 September at 06:10 | 85 MW | 25 | N20 |
| 27 September at 05:49 | 41 MW | 10 | N |
| 26 September at 19:02 | 231 MW | 27 | N20 |
| 26 September at 18:41 | 245 MW | 34 | N |
| 26 September at 18:05 | 365 MW | 40 | N21 |
| 26 September at 06:27 | 3 MW | 3 | N20 |
| 26 September at 05:32 | 8 MW | 2 | N21 |
| 26 September at 02:18 | 12 MW | 1 | Terra |
| 25 September at 20:32 | 73 MW | 1 | Aqua |
| 25 September at 19:02 | 30 MW | 4 | N |
| 25 September at 18:26 | 65 MW | 4 | N21 |
8 other fires near Tocantins (BR)
Separate fires, apart in time or in space, not pieces of this one. A single municipality can have several over one summer, and a forest massif often covers more than a hundred square kilometres.
Follow live
The map shows active fires in 3D, with smoke plumes, forecast wind, drop zones and the live position of water bombers tracked by ADS-B, anywhere in the world.
Open the fire mapTake the data of this fire with you
A ready-to-use archive, paid once, no subscription. It contains:
- the satellite detections of the fire
- the contours of its progression
- the drops and the aircraft tracks
- the lightning around it
- the severity of the burned area, when computed
From €20.00 excl. VAT, six formats to choose from, link valid for 30 days.
Download the dataPro subscribers: included. €49 excl. VAT a month, no commitment. The public map stays free. Discover GISFire Pro
© 2026 SARO · Gistin. All rights reserved. The interface, its presentation and the contents of GISFire are protected; reproducing or imitating them requires written permission. The source data remain the property of their respective producers, see the credits.